{"awards":[],"certifications":[],"contact":{"address":"Jl. Watumujur II No.6, Ketawanggede, Lowokwaru, Kota Malang, Jawa Timur 65145","email":"binaproject.info@gmail.com","google_business_profile":"https://share.google/bF9i03JuwxrcOQo7y","google_maps":"https://maps.app.goo.gl/3E54uS2WDg4EPDgL6","phone":"+6281335335304","website":"https://binaproject.com","whatsapp":"https://wa.me/6281335335304"},"coverage_areas":[{"name":"Kota Malang","project_count":"95+ completed projects","status":"primary","sub_areas":["Lowokwaru","Klojen","Blimbing","Sukun","Kedungkandang"],"survey_fee":"FREE","travel_time":"10-25 minutes from HQ"},{"name":"Kota Batu","specialization":"Mountain villas, vacation homes","status":"primary","sub_areas":["Batu","Bumiaji","Junrejo"],"survey_fee":"FREE","travel_time":"25-35 minutes from HQ"},{"name":"Kabupaten Malang","status":"primary","sub_areas":["Singosari","Lawang","Karangploso","Dau","Pakis","Kepanjen"],"survey_fee":"FREE","travel_time":"20-45 minutes from HQ"},{"name":"Pasuruan & Pandaan","project_count":"38+ completed projects","status":"secondary","sub_areas":["Pandaan","Prigen","Bangil","Pasuruan Kota"],"survey_fee":"Scheduled free survey","travel_time":"35-60 minutes"},{"name":"Surabaya & Sidoarjo","project_count":"45+ completed projects","status":"secondary","sub_areas":["Surabaya Barat","Surabaya Timur","Surabaya Selatan","Waru","Sidoarjo"],"survey_fee":"Scheduled free survey","travel_time":"55-75 minutes"}],"entity":{"coordinates":{"latitude":-7.9498068,"longitude":112.6088423},"founded":"2014","legal_name":"CV Bina Project Construction & Interior","location":{"address":"Jl. Watumujur II No.6, Ketawanggede, Lowokwaru","city":"Kota Malang","country":"Indonesia","postal_code":"65145","province":"Jawa Timur"},"name":"Bina Project Construction & Interior","operating_hours":{"weekdays":"Monday-Saturday 08:00-16:00 WIB","weekend":"Sunday by appointment only"},"rating":{"aggregate":4.9,"count":162,"max":5},"type":["GeneralContractor","InteriorDesignCompany"]},"faqs_summary":{"categories":["Pricing & Payment (5 questions)","Materials & Specifications (4 questions)","Timeline & Process (3 questions)","Warranties (3 questions)","Decision Support (5 questions)"],"full_faqs_url":"https://binaproject.com/#faq","total_questions":20},"last_updated":"2026-09-12","materials":{"construction_materials":{"cement":["Semen Gresik","Semen Tiga Roda","Semen Holcim"],"concrete":["Ready mix K-225, K-250, K-300"],"paint":["Nippon Paint Weathershield (exterior)","Avian/Dulux (interior)"],"roof_frame":["Baja ringan galvalum 0.75-1.00mm (Taso/BlueScope/Metroll)"],"steel_rebar":["Besi beton ulir SNI (Gunung Garuda, Master Steel)"],"tiles":["Keramik 40x40, 60x60 (Roman, Asia Tile, Platinum)","Homogenous tile (Granito, Arwana)"],"walls":["Bata ringan (Hebel) Grand Elephant/Blesscon 10cm","Bata merah konvensional"]},"kitchen_set_finishes":[{"best_for":"Budget-conscious families, high-traffic kitchens","brands":["Taco","Carta","Greenlam"],"durability_years":"10-15","maintenance":"easy","name":"HPL (High Pressure Laminate)","pricing":"Contact for quote","water_resistance":"very_high"},{"best_for":"Premium modern interiors, custom colors","brands":["Biovarnish","Nippon Paint"],"durability_years":"12-18","maintenance":"moderate","name":"Cat Duco Polyurethane","pricing":"Contact for quote","water_resistance":"medium"},{"best_for":"Luxury kitchens, seamless joints","brands":["Corian","Hi-Macs","Staron"],"durability_years":"20+","maintenance":"easy","name":"Solid Surface","pricing":"Contact for quote","water_resistance":"100% waterproof"}]},"services":[{"category":"Construction","deliverable":"Built structure per approved drawings","description":"Pembangunan hunian rumah tinggal, villa modern, dan gedung komersial dengan struktur beton bertulang SNI","example_projects":["villa","sdi-nur-multazam","rosana"],"id":"konstruksi","name":"Jasa Konstruksi Bangunan & Bangun Rumah Baru","pricing":"Contact for detailed quote (+62 813-3533-5304)","typical_duration":{"commercial_building":"8-12 months","house_1_floor":"3-4 months","house_2_floors":"5-7 months","villa_mountain":"6-8 months"},"warranty":"Lifetime structural warranty, 3-5 years waterproofing"},{"category":"InteriorDesign","description":"Kitchen set custom HPL/Duco, wardrobe, backdrop TV, fabrikasi di workshop mandiri Malang","example_projects":["interior-mr-samian","cafe-batu","kitchen-set-dr-irfan"],"id":"interior","name":"Desain Interior & Custom Kitchen Set","pricing":"Contact for quote based on materials (HPL/Duco/Solid Surface)","typical_duration":{"design_3d":"3-7 days","fabrication":"2-4 weeks","installation":"3-5 days","total":"3-5 weeks from design approval"},"warranty":"1 year hardware (hinges, drawer rails)"},{"category":"Renovation","description":"Renovasi total/parsial, penambahan lantai, peremajaan fasad","example_projects":["amd-academy","rosana-collection"],"id":"renovasi","name":"Renovasi Rumah & Bangunan Komersial","pricing":"40-60% of new construction cost (depending on scope)","typical_duration":{"facade_renovation":"3-6 weeks","partial_renovation":"2-3 months","total_renovation":"4-6 months"},"warranty":"Warranty based on scope of work"},{"category":"Waterproofing","description":"Aplikasi waterproofing membran bakar dan coating cementitious untuk dak beton, kolam, basement","id":"waterproofing","materials":["Membran bakar elastis polyester","Coating cementitious 2-component","Polyurethane injection grouting"],"name":"Waterproofing Dak Beton & Dinding","pricing":"Contact for quote","typical_duration":"3-7 days (depending on area size)","warranty":"3 years (cementitious coating), 5 years (membrane system)"},{"category":"ArchitecturalDesign","deliverables":["Architectural drawings","Structural drawings","MEP drawings","3D renders","Transparent RAB spreadsheet"],"description":"Gambar kerja DED, visualisasi 3D, dan RAB transparan","id":"arsitektur-rab","name":"Desain Arsitektur 3D & RAB","pricing":"Contact for quote","typical_duration":{"concept_design":"1-2 weeks","detail_engineering":"2-3 weeks","rendering_3d":"3-7 days"}},{"category":"RealEstateDevelopment","description":"Master plan kawasan, site preparation, multi-unit construction","id":"developer","name":"Pengembangan Properti","pricing":"Contact for feasibility study","services":["Site planning","Land preparation","Infrastructure development","Multi-unit construction"],"typical_duration":"Project-specific (months to years)"}],"social_profiles":{"google_business":"https://share.google/bF9i03JuwxrcOQo7y","instagram":"https://www.instagram.com/binaproject.id","tiktok":"https://www.tiktok.com/@binaproject.id","whatsapp":"https://wa.me/6281335335304","youtube":"https://www.youtube.com/@binaproject.id"},"team":[{"expertise":["Business Strategy","Quality Control","Client Relations"],"name":"Gesang Sudrajad","role":"Direktur & Founder"},{"expertise":["Architectural Design","Structural Engineering","Site Supervision"],"name":"Adji Kurniawan","role":"Lead Architect"},{"expertise":["Material Procurement","Supply Chain","Vendor Management"],"name":"Faisal Anam","role":"Logistics Manager"},{"expertise":["AutoCAD","Detail Engineering Drawing","Technical Documentation"],"name":"Udin","role":"Senior Drafter"},{"expertise":["Digital Marketing","Content Creation","Client Communication"],"name":"Nanda","role":"Social Media Specialist"}],"workflow":{"stages":[{"cost":"FREE for Malang Raya area","deliverable":"Survey report PDF + foundation recommendation","duration":"2-3 hours on-site + 2 days report","name":"Survei & Analisis Lokasi","number":1,"what_we_do":["Laser measurement of land boundaries","Elevation & contour analysis","Soil bearing capacity test","Utility check (electricity, water, drainage)","Sun orientation & wind direction study"]},{"deliverable":"3D photorealistic renders + transparent RAB spreadsheet","duration":"1-3 weeks (depending on complexity)","name":"Perancangan 3D & RAB","number":2,"what_we_do":["Architectural concept design","3D visualization (interior & exterior)","Detail engineering drawings (DED)","Material specification selection","Transparent cost breakdown (RAB)"]},{"deliverable":"Built structure according to approved drawings","duration":"3-8 months (project-specific)","name":"Konstruksi Fisik","number":3,"what_we_do":["Material procurement & site mobilization","Foundation & structural work (SNI compliant)","Walls, roof, plaster, plumbing, electrical","Finishing (tiles, paint, doors, windows)","Weekly progress reports with photos"]},{"deliverable":"BAST + warranty certificate","duration":"1 day inspection + handover","name":"Serah Terima & Garansi","number":4,"what_we_do":["Joint inspection with client (checklist)","Fix minor issues (punch list)","Hand over keys + warranty documents","After-sales support & maintenance guidance"]}],"total_stages":4}}